Budget is the home of headache over a matter, it is usual, but when decorating a shoddy work, your mood will be super depressing, but don't worry, every move is important.

How to see through the places people did, small series revealing to you immediately.

No. 1 recruit wall paint stealing work index: ★ ★ ★

Phenomenon: latex paint is by far the most common wall decoration materials, construction of the concrete can be brushing, roller coating or spraying.

If the workers in the construction without seriously or ordinary perfunctory, appear small color differences. Especially in the darker paint more this issue.

Expert reminder: emulsion paint before using the water needed to be sure, syrupy latex paint to an exhausted.

Same color coating is the best time for painting is complete. If the construction is finished walls need repair, it is necessary to restart the entire wall surface for painting again.

2 move into the water pipe stolen work index: ★ ★

Phenomenon: construction team in decoration, it is sometimes easy to figure, will contain a lot of cement, sand and concrete fragments into the sewers.

A direct consequence of this is causing serious plug sewer, and the bathroom because the water in the kitchen in domes and running water. Some works while in the final acceptance without problems, but always appears the water are not clear.

Expert reminder: strict supervision of the construction team, you cannot get the sewer when garbage road use.

The waterway construction has been completed, all the water basin, washstand and bathtub filled with water, and then also waterproof, have a look at the water is smooth, the pipeline is there is leakage problems.

3 tips to wire connectors steal workers index: ★ ★

Phenomenon: electrical installation Sockets, switches, and lighting, wiring by construction requirements.

Especially in consumer use of some of the electricity consumption of a large water-heater, air conditioner, appliances, switches, outlets, fever, or even burned down, give consumers a great loss.

Expert reminder: construction supervision and electricians in strict accordance with the procedures for construction, in all switches, outlets, after installation, be sure to have practical use to see if these parts are there.

4 move tiles paving steal workers index: ★ ★ ★

Phenomenon: paving tiles is a more technical processes.

If the workers shoddy work, most prone to tile hollowing, uneven on joints and other issues, paving tiles used cements and adhesives also pay attention to, if unreasonable proportions also appear off.

Expert reminder: Beijing construction Committee introduced the "household decoration project quality approval standard, called tiles paving should be flat and firm, clear, no dirt and mortar casts, surface luster is basically the same, the seam evenly, plate no crack, off corners and short edge, partially empty drum shall be 5% of the total.

5 tips to wall tick Groove steal workers index: ★ ★ ★

Phenomenon: a buried pipeline must on the walls and floors can be slotted into the pipeline.

A small number of workers in the construction of slot action is brutal, not only destroyed the building load-bearing structure, it is also possible to other pipeline in the vicinity of the damage.

Expert reminder: prior to the construction and the construction of captain once again confirm the trends and the location of the pipeline.

For different wall structure, slotting requirements are also different: housing in load-bearing walls is not allowed with slotted and thermal insulation of walls in the slot, easily surface cracking, while on the ground, the more careful Groove cannot undermine the floor, to the downstairs tenants caused trouble.