If you are a first-time landlords face decoration decoration, which must have been quite puzzled, but also had to boost the dike, journalists especially for you to collect common shoddy work.
No. 1 recruit-wall paint
Steal workers index: ★ ☆
Phenomenon: latex paint is by far the most common wall decoration materials, construction of the concrete can be brushing, roller coating or spraying.
If the workers in the construction without seriously or ordinary perfunctory, appear small color differences. Darker paint more this issue.
Expert reminder: emulsion paint before using the water needed to be sure, syrupy latex paint to an exhausted.
Same color coating is the best time for painting is complete. If the construction is finished walls need repair, it is necessary to restart the entire wall surface for painting again.
2 stroke-water pipe
Steal workers index: ★ ★
Phenomenon: construction team in decoration, it is sometimes easy to figure, will contain a lot of cement, sand and concrete fragments into the sewers.
The consequences of doing so is serious plug sewer, resulting in the kitchen and the bathroom due to poor water and running water. Some works are in the final acceptance without problems, but always appears the water are not clear.
Expert reminder: strict supervision of the construction team, you cannot get the sewer when garbage road use.
The waterway construction has been completed, all the water basin, washstand and bathtub filled with water, while watching the water is waterproof, smooth, pipeline for leakage problems.
3 strokes-wire connector
Steal workers index: ★ ★ ☆
Phenomenon: electrical installation Sockets, switches, and lighting, wiring by construction requirements.
Especially in consumer use of some of the electricity consumption of a large water-heater, air conditioner, appliances, switches, outlets, fever, or even burned down, give consumers greater losses.
Expert reminder: construction supervision and electricians in strict accordance with the procedures for construction, in all switches, outlets, after installation, be sure to have practical uses, see these parts are there.
4 strokes-tiles paving
Steal workers index: ★ ★ ★
Phenomenon: paving tiles is a more technical processes.
The workers shoddy work, most prone to tile hollowing, on issues such as sewing, uneven paving tiles used cements and adhesives also pay attention to, if unreasonable proportions also appear off.
Expert reminder: according to the Ministry of the family room decoration engineering construction specifications, requirements for wall and floor tiles paving should be flat and firm, clear, no dirt and mortar casts, surface luster is basically the same, the seam evenly, plate no crack, off corners and short edge, partially empty drum shall be 5% of the total.
5 tips-wall tick Groove
Steal workers index: ★ ★ ★ ☆
Phenomenon: a buried pipeline must on the walls and floors can be slotted into the pipeline.
A small number of workers in the construction of slot action is brutal, not only destroyed the building load-bearing structure, it is also possible to other pipeline in the vicinity of the damage.
Expert reminder: prior to the construction and the construction of captain once again confirm the trends and the location of the pipeline.
For different wall structure, slotting requirements are also different: housing in load-bearing walls is not allowed with slotted and thermal insulation of walls in the slot, easy on the surface cracks, and in the ground, the more careful slots cannot undermine the floor, to the downstairs tenants caused trouble.
6 strokes-joint modifier
Steal workers index: ★ ★ ★ ★
Phenomenon: in some walls and doors, window docking, and two different color coating docking place, it is the workers often perfunctory.
You often see latex paint and coating of wood do mingle among the seams problems.
Expert reminder: for the seam of the handling is very important that you have to supervise the construction workers seriously.
If the wall has two colors of paint, relative received in construction must be in the first color of the border Department of adhesive tape, and then paste the brushing another color of paint, so long as after the construction of the tapes, the torn seams can be very neat.
7 strokes-wire worn tubes
Steal workers index: ★ ★ ★ ★ ☆
Phenomenon: in the home renovation and construction, almost all the wires are dressed in PVC pipe, buried in the wall.
Therefore the wire into the PVC pipe, consumers can't see, and difficult to replace. If workers do not seriously in action will lead wire kink in the tube, causing electric breach. If the worker wishes to shoddy work, it will use the wires or belt joints will wear a few shares of wires in the same root PVC tubes.
Expert reminder: consumers best buy wire, and on site supervision and workers, after installation inspection to be powered on.
In addition, the consumer must let the decoration company left a piece of "line drawing". When the electrician had just put the wires embedded into the walls, you can put these walls number and draw a floor plan, then the strokes with the wiring and the specific location, annotated on the ground floor, and the adjacent wall orientation, in particular, shall indicate the location of the connector line, so that in the event of a failure, you can find the lines at once.
8 strokes-small surface treatment
Steal workers index: ★ ★ ★ ★ ☆
Phenomenon: the so-called "small side", are some of the consumers ' eyes do not see, and don't pay attention to the little places, such as the apartment of the top, below the window sill plate, heating cover inside, some workers here are cutting corners, even without any processing.
Expert reminder: remember everything is six planes, in the examination of project quality, don't ignore any details.
The nine-floor-leveling
Steal workers index: ★ ★ ★ ★ ★
Now
Image: some housing ground not flat, re-leveling decoration needs. If a worker is not careful or intentionally crude, it will cause more uneven found "Vietnam" and construction using cement mortar will greatly increase surface loads, to building security risk.
Expert reminder: when leveling the ground must do before base treatment on the ground, and then use the cement mortar for floor levelling.
After the dry cement, with dedicated level gauge determines the flatness of the entire surface, and then to the next step in construction.
10 strokes-substrate processing
Steal workers index: ★ ★ ★ ★ ★
Phenomenon: apply latex paint, paving tiles before doing a basement.
Some workers in construction, in this regard, Jerry, ranging from causing wall unevenness, latex paint Daubs color shading, after weighing the latex paint color falls off, or tile paste not prison.
Expert reminder: when the pavement construction of wall and floor tiles, ceramic tile you want to pay attention to could not be directly shop in lime mortar, Lime plaster, gypsum, paper reinforced jute sword lime slurry and emulsion paint on the surface, but to the base plane processing clean rear can be laid.
Ceramic tile and substrate of the bond between the use of slurry should be strictly in accordance with the construction standards and provisions for the use of proportional allocation, clinker, the cementing of plastic materials that cannot be provisioned.
Coating emulsion paint, you must take note wall PuTTY with scraping is uniform, smooth, polished and roll painting is in place.
In addition, you should pay attention to whether the proper proportions of latex paint.